Done Rite Roofing removed existing tiles from building 1806 and 1810 to wood decking and install new Boral tiles to match existing buildings. The entire perimeter of the buildings received a screw down as well as a foam down system. Tile ridge anchors at all hips and ridges were installed and tiles were secured also with a screw and foam down system. Along with the new tiles, new boots, drip edge as well as all valleys flashed with metal flashing and all decking re-nailed to code. Upon completion, all debris was cleaned and removed to follow a clean-up with a magnet to remove any loose nails.